4-WAY POWER BOARD WITH 3M LONG-LEAD

    $19.95

  • Order Code: PT4113
  • Availability: In Stock
  • SURGE PROTECTED - SWITCHED

  • 10A Circuit Breaker
    Surge protection
    Master Power Switch
    Right-Angle Plug
    Extra-long 3 metre cord

  • Related Products for 4-WAY POWER BOARD WITH 3M LONG-LEAD

    Related Products : View Product Group Page

    4-WAY POWER BOARD WITH 3M LONG-LEAD

    Found in Category : Power Electrical

    Product Specs for 4-WAY POWER BOARD WITH 3M LONG-LEAD

    Colour White
    Length 3M
    Plug R/Angle
    Switch Single
    Outlet 4
    Fuse Resettable 10A
    Cable 3.0M
    Filter Surge
    Wagner eBook 08-54
    Type 4 Way
    Cord 3.0M
    Voltage 240Vac
    Manufacturer Jackson

    No downloads currently available for 4-WAY POWER BOARD WITH 3M LONG-LEAD

    Please contact us with your download requirements,e.g. User Manual, Data Sheet, etc and will get back to you.

    Enter Full Name
    Enter Email Address Enter Valid Email
    Enter Phone Number
    Download Required / Comments.

    Enter Full Name PT4113
    Enter Email Address Enter Valid Email
    Enter Phone Number
    Enter The Question

    Contact us for Bulk Buy and Project Based Pricing for 4-WAY POWER BOARD WITH 3M LONG-LEAD

    Enter Full Name
    Enter QTY
    Enter Email Address Enter Valid Email
    Enter Delivery Time
    Enter Phone Number

    Enter The Notes / Addtional Info.

    $9.90 Australia Wide Flat Rate Shipping*

    No matter where you are located in Australia we offer flat rate shipping. Some conditions apply,
    please see our Terms and Conditions page.

    Store Pick Up from Sydney Showroom

    Goods can be picked from our premises from 8.30AM to 5.00PM Monday to Friday and from 9AM till 4PM on Saturday.
    In order to avoid delays it is recommended that you place your order 2 hours prior to pick up. please see our
    Terms and Conditions page for more details.

    International Order Shipping Available

    We ship internationally. Once your order is received we will advise shipping cost to you by email.
    Your order will be updated with the freight cost.

    © 2015 Wagner Online Store. All Rights Reserved